Underground Mine Design Using Surpac

Course Objectives:

  • To enable Mining engineers to utilize the latest technologies in underground mining planning and design.

Learning Outcomes:

  • Upon completion, you will be able to:
Skill Application
Design underground development Ramps, shafts, access drives, and ventilation raises
Create stopes Manual and automated stope design tools
Block model analysis Tonnage and grade calculations for reserves
Ring design basics Underground blast pattern planning and hole charging
Drafting & documentation Plot level plans and longitudinal sections
Solid modeling Create, repair, and validate 3D solids for mine models

Course Content:

  • Day 1: Establishing the Geological Database and Project Parameters:
    • Introduction to Surpac interface and essential file types (string, DTM).
    • Project setup, work directory management, and data organization.
    • Importing various data formats.
    • Creating and managing a geological database, importing drillhole data (collar, survey, assay), and 3D visualization of drillholes.
  • Day 2: 3D Geological Modelling and Mineral Resource Estimation:
    • Creating and editing 2D strings and sections.
    • Building 3D wireframe solids from section data to represent ore bodies.
    • Introduction to block modeling concepts for underground resource estimation.
    • Underground Access, Development Planning, and Infrastructure.
  • Day 3: Designing underground access: declines, ramps, and horizontal development drives:
    • Creating centerlines and using profile files to create 3D solids of excavations.
    • Calculating development volumes.
    • Introduction to level planning and vertical development design.
  • Day 4: Stope Design, Optimization, and Sequencing:
    • Digitizing stope outlines from geological solids.
    • Understanding underground layouts and stope design principles.
    • Performing stope optimization and learning to define exclusions to optimize stope layouts.
    • Calculating stope volumes and grades.
  • Day 5: Advanced Blast Design and Final Technical Reporting:
    • Introduction to underground drill and blast design, including ring design for stopes.
    • Generating volume and reserve reports.

Audience:

  • Mining engineers.
  • Geological engineers.
  • Technicians working in the field of mining.

Duration:

  • 5 Days.